Basic Info.
Method
Spray
Level
Finish Coat
Drying Method
Air Drying
Certification
ISO14001, CCC, RoHS, ISO9001
Substrate
Ceramic , Wood , Stone , Glass
Components
Film Forming Matter
Formation Mechanism
Conversion Type
Transport Package
200L Drum
Specification
A & B
Trademark
HIGHTOP
Origin
Shandong China
HS Code
3907299090
Production Capacity
5000000/Month
Product Description
Polyurethane Spray Machine Closed Cell Spray Foam Pu Cord Jointing Machine Open Cell Spray Foam Insulation Kit |
200L/drum, 4 drums per pallet, 80 drums for one 20ft container.
Foam Performances | ||
items | Test Method | Index |
Spray Density | GB 6343 | >40kg/m3 |
Closed-cell Rate | GB 10799 | ≥90% |
Initial Thermal Conductivity(15ºC) | GB 3399 | ≤24mW/(m.K) |
Compressive Strength | GB/T8813 | ≥150kPa |
Adhesive Strength | GB/T16777 | ≥120kPa |
Elongation at break | GB/T9641 | ≥10% |
Dimentional Stability 24h -20ºC | GB/T8811 | ≤1% |
24h 70ºC | | ≤1.5% |
Water Absorption | GB 8810 | ≤3% |
Oxygen Index | GB 8624 | ≥26 |
Advantage of polyurethane spray foam insulation machine PU Foam Polyurethane insulation raw material 1. The cylinder solenoid valves are all imported, more expensive than the common cylinders. 2. Free on-line training for technology, full way tracking and testing, high sales volume. 3. All accessories are supplied by the original manufacturer and are available to customers at cost price 4. The high pressure pipe is anti-corrosion. 5. The temperature control meter is dual display, which can display the actual temperature and the set temperature. Other manufacturers can only display the set temperature and can not see the actual temperature. Red meter shows the actual temperature, green shows the set temperature 6. The operation temperature control panel is independent module which can be replaced separately. For other factories ,there is an integrated board next to the temperature control table,if one is broken ,others temerature meters all should be changed . Learn to maintain machine : Main Machine Daily Use and Maintenance: 1 Replace DOP in oil cup of primary-secondary pump daily; 2 When equipment stops running, swerve Start/Reset switch to reset direction, making sure cylinder rod fully soaked inside DOP liquid, in this way it can prolong service life of seal ring. 3 Check sensitivity of the equipment heating system, if anything goes wrong, please fix the problem as soon as possible. 4 When equipment isn't working, please turn off heating system timely, for not only it prevents potential danger also avoids low foaming quality cuz polyol material long-time heating. 5 Make sure turning on and off heating system in correct order. When turning on, first start main power,then turn on heating system; when turning off, first stopping heating system then turning off main power.