- Overview
- Product Description
- Product Parameters
- Main Parts
- Photo of Foaming Machine
- Installation Instructions
- Terms of Payment
- Time of Delivery
Basic Info.
Product Description
High pressure polyurethane foaming machine is widely used for many different polyurethane products, such as different seats cushions including bicycle seat cushion, car seat cushion, furniture seat cushion,motorcycle seat cushion, office chair, memory pillow, steering wheel, dash board, bumpers, heat insulation products including freezer, refrigerator, disinfection cabinet, kitchen cabinet, insulation box, water heater and insulation board, wood like products etc.
The appearance of this PU foaming machine is attractive, layout is reasonable, performance is stable and reliable, it is a good choice for customer making flexible foam products.
This PU foaming machine is controlled by PLC system, with intelligent production capacity, can meet the requirement of complicated process of intelligent assembly line and intelligent mechanical arm .
Many spare parts of this PU foaming machine are imported brands, this machine is also equipped with new imported prolonged foaming gun, polyurethane specialized pump, it has professional and fast refrigerating and heating constant system, optional high-precision imported flow meter, make sure the effect of every injection is high-precision and the mixing is perfect. Main Parts of High Pressure Foaming Machine | Basic Spare Parts |
POL Metering Unit (POL is also called White Material) | |
ISO Metering Unit (ISO is also called Black Material) | |
Hydraulic Pressure System | |
Mixing head | |
High pressure tubes | |
Electronic control cabinet | |
Air-operated test units | |
POL Storage Tank (POL is also called White Material) | |
ISO Metering Tank(ISO is also called Black Material) | |
Distribution Valve Circulation Unit | |
Self-Cleaning Filter | |
Temperature Control Unit |
If customer need us to send the engineer to do installation and training in customer's factory, we will send the engineer for this after-sales installation.
By TT, 40% deposit paid before production, 60% balance paid before delivery.
30 Working days after receiving the deposit.
Thank you for your attention, welcome to inquire with us !